General Requirements for CYCLE-TAINER Solvent Delivery System

Information

Question What do I need in order to set up the 4 L, 18 L, 52 L, 215 L, and 225 L CYCLE-TAINER solvent delivery system?
Answer

There are several configuration options for CYCLE-TAINER solvent delivery system. At minimum, you will need:

  • Gas supply to provide positive pressure to dispense the solvent.
  • Gas regulator to regulate the gas supply pressure.
  • Tubing and Quick-Connects to direct gas and solvent vent line for pressure relief valve vent line for pressure rupture disk.
  • Solvent line.
  • Gas line.
  • Ventilation may be needed during operation in the event of over pressurization of the container.
  • Grounding to eliminate static electricity build up near the flammable solvent.
  • An area for proper storage of the container. The CYCLE-TAINER solvent delivery system should be stored upright in a cool, clean, covered area.

Trademarks are owned by Avantor Performance Materials, LLC. or its affiliates unless otherwise noted.
2018 Avantor Performance Materials, LLC.

File CYCLE-TAINER™ solvent delivery systems Set-up Rev.3.pdf
Keyword General Requirements for CYCLE-TAINER Solvent Delivery System setup, Cycle-Tainer setup
  • Was this article helpful?